Park Royal Data Centre

Alpha Controls replaced the cooling-tower fans and upgraded their controls at a live data centre in Park Royal — swapping two inverter-driven fans for eighteen individually controlled EC fans across the tower's two cells, installing a new BMS control panel, and running fully segregated power and network containment from the plant room up to the roof, all in a critical, occupied environment.

Park Royal, London NW10
2026
Data Centre
Data centre in Park Royal, London — exterior

Project Overview

At a live data centre in Park Royal, Alpha Controls carried out a cooling-tower fan replacement and BMS control upgrade for the rooftop cooling plant. The original arrangement — two large fans, each driven by its own inverter — was replaced with eighteen electronically commutated (EC) fans, nine on each cell of the cooling tower, giving finer speed control and built-in redundancy across the array.

Working in a business-critical environment, Alpha Controls removed the two existing inverters, installed a new BMS control panel, and ran power and control networks from the plant room at Level 1 up to the rooftop at Level 3 — cabling every fan individually and keeping power and data cleanly segregated from end to end.

Bank of nine EC cooling-tower fans installed on one cell of the cooling tower
New BMS control panel with touchscreen supervisor for the cooling-tower plant

Project Scope

Alpha Controls delivered the electrical and controls scope for the cooling-tower upgrade: removing the two redundant inverters, feeding new power supplies into two adaptable junction boxes, and installing a new BMS control panel. From there, a network backbone was run from Level 1 to the Level 3 roof to reach a pair of enclosures either side of the cooling tower, with power and data cabled out to all eighteen fans on top.

On the roof, power was distributed through a GRP distribution board on each side and the fan networks landed in a separate adaptable enclosure — power and network containment run on fully segregated trays. A network link was routed across the roof to tie the two sides together, bringing every fan back onto a single control network.

System Overview

The upgraded cooling tower is controlled from a new panel in the plant room, driving eighteen EC fans across the two cells and networked back through the rooftop enclosures. The works comprised:

  • Two inverters removed — the original inverter-driven fan arrangement stripped out ahead of the retrofit
  • 18 EC cooling-tower fans — nine per cell, each individually powered and networked for independent speed control
  • New BMS control panel — with an on-panel touchscreen supervisor for the cooling-tower plant
  • Level 1 to Level 3 network backbone — control network run from the plant room up to the rooftop enclosures
  • GRP distribution boards — one each side, distributing power to the fans on that cell
  • Segregated power & network containment — separate adaptable enclosures and dedicated trays keeping power and data apart
  • Over-roof network link — tying the two sides together so all eighteen fans sit on one control network
Rooftop network enclosure and isolators on segregated containment beside the cooling tower
GRP distribution board feeding power to one cell of cooling-tower fans

Rooftop Cooling-Tower Fans

The heart of the job sits on the roof at Level 3. Where the tower previously relied on two large, inverter-driven fans, it now runs eighteen EC fans — nine on each cell — each with its own power feed and network drop. Splitting the duty across a bank of smaller fans gives the data centre finer control of cooling output and keeps the tower running if an individual fan is taken offline.

Every fan was cabled back to the enclosures on its side: power down from the GRP distribution board, and a network connection into the adaptable enclosure alongside it. With the containment kept separate for power and data, the rooftop installation stays clean, serviceable and easy to fault-find.

Nine EC fans installed across one cell of the cooling tower

Power & Network Segregation

In a data centre, clean separation of power and control wiring matters — it keeps electrical noise off the network and makes the installation safe to work on live. Alpha Controls ran the fan power through GRP distribution boards and the fan networks through separate adaptable enclosures, on their own dedicated containment routes across the roof.

A single network link, run over the roof between the two sides, brings both banks of fans onto one control network back to the panel — so the whole tower is monitored and driven from a single point.

On the Roof

From the old plant-room inverters that came out to the new rooftop fan banks — a look at the cooling-tower upgrade.

The original inverters that drove the two cooling-tower fans, removed as part of the upgrade
The second bank of nine EC fans on the opposite cell of the cooling tower
Individual fan connection housings on the cooling-tower deck
Plant-room power distribution feeding the cooling-tower plant
Cooling tower with the new rooftop control enclosure

Results

With installation complete and energised, the cooling-tower upgrade delivers:

  • Eighteen EC fans installed and powered: nine per cell, replacing the two original inverter-driven fans
  • Independent fan control: each fan individually cabled for power and network, allowing granular cooling and built-in redundancy
  • New control panel and network: a single BMS panel driving both cells, linked over the roof onto one control network
  • Clean, segregated installation: power and data on separate containment, safe to service and simple to fault-find
  • Delivered live and online: the works completed in an occupied, business-critical data centre, with final testing and commissioning as the closing stage

Technical Specifications

Cooling-Tower Fans

  • 18× EC Fans (9 per cell)
  • Individual Power + Network per Fan
  • Two Inverters Removed
  • Independent Speed Control

Control System

  • New BMS Control Panel
  • On-Panel Touchscreen Supervisor
  • Single Control Network
  • Plant Room to Rooftop Backbone

Power & Containment

  • 2× GRP Distribution Boards
  • Adaptable Network Enclosures
  • Segregated Power / Data Trays
  • Over-Roof Network Link

Project Delivery

  • Live Data Centre Environment
  • Level 1 to Level 3 Cabling
  • Installed & Energised
  • GUVNR.ai Shift Tracking