
Blog & Insights
Building Management Insights
Expert advice, industry insights, and practical guides on building management systems, energy efficiency, and building automation technology.
Filter & sort
Current sort: Date: Newest first. Read filter: any.
149 articles found

HVAC SystemsFeatured
Why the Frost Stat Is on the Extract Side of a Plate Heat Exchanger
On a plate heat exchanger AHU the frost protection reads the extract, not the incoming fresh air, and engineers rewire it believing it to be a mistake. Why the ice forms on the extract side, how pack frost protection differs from the coil frost stat, and what actually triggers a defrost.
11 Oct 20269 min read
Read Article
Latest Articles

HVAC Systems
What Is a Recuperator AHU, and How Does It Compare With a Thermal Wheel?
A recuperator AHU recovers heat through a static plate pack; a thermal wheel does the same job with a rotating matrix and moves moisture with it. What separates them, the efficiency figures the manufacturers actually publish, and the different point schedule each type lands on a controls contractor.
11 Oct 20269 min
Read
BMS Technical
AHU Controls: How Air Handling Unit Control Sequences Actually Work
A full guide to AHU control sequences: start/stop and optimum start, the damper sequence, fan control, coil sequencing through a deadband, CO₂ demand ventilation, heat recovery by device type, both frost protections, and what to prove at commissioning before you accept a unit.
11 Oct 202612 min
Read
Case Studies
24V Window Actuator Wiring After a School Roof Replacement
Royal Harbour Academy, Ramsgate: eight weather-damaged 24V window actuator feeds re-cabled in 4 mm² fire-resistant cable, AHU control cabling drawn back and re-terminated, and extract fans wired back to the BMS during a roof replacement.
2 Oct 20267 min
Read
HVAC Systems
VAV Installation: TROX VAVs & Sontay CO₂ on a Trend BMS
A real VAV installation on a refurbished office floor: four TROX TA-Silenzio extract VAVs and Sontay duct CO₂ sensors wired back to a Trend panel two floors up. Core-by-core terminations, the signal-range and mode checks that decide whether the floor works, and what good looks like at handover.
28 Sept 20269 min
ReadMore Articles
Page 12 of 15

Tendering / Quoting6 Apr 202639 min
50 FAQs: BMS & Mechanical Engineering Quoting and Tendering
Read Article
Maintenance / FM3 Apr 202614 min
Reactive vs Planned BMS Maintenance: Why FM Teams Keep Firefighting
Read Article
Tendering / Quoting1 Apr 202616 min
How to Spot a Bad BMS Tender Before You Sign It
Read Article
BMS / Maintenance30 Mar 202614 min
Why Your BMS Contractor Keeps Letting You Down — And What to Do About It
Read Article
BMS Maintenance & Commissioning27 Mar 202618 min
5 Signs Your BMS Needs Recommissioning
Read Article
BMS25 Mar 20266 min
BMS Installation Cost UK: What to Budget in 2026
Read Article
BMS Platform Comparison23 Mar 202616 min
Trend vs Distech: Choosing the Right BMS Platform for Your Building
Read Article
BMS20 Mar 20267 min
Trend 963 End of Life: Your Options for Upgrading to IQVISION
Read Article
BMS Maintenance18 Mar 202614 min
What Should Be in a BMS Maintenance Contract? SLAs, Spares and Red Flags
Read Article
BMS Installation13 Mar 202614 min
BMS Installers and Contractors in Kent: What to Check
Read ArticleReady to Optimise Your Building?
Get expert advice on building management systems, energy efficiency, and building automation solutions tailored to your needs.
Get in Touch