
Blog & Insights
Building Management Insights
Expert advice, industry insights, and practical guides on building management systems, energy efficiency, and building automation technology.
Filter & sort
Current sort: Date: Newest first. Read filter: any.
149 articles found

HVAC SystemsFeatured
Why the Frost Stat Is on the Extract Side of a Plate Heat Exchanger
On a plate heat exchanger AHU the frost protection reads the extract, not the incoming fresh air, and engineers rewire it believing it to be a mistake. Why the ice forms on the extract side, how pack frost protection differs from the coil frost stat, and what actually triggers a defrost.
11 Oct 20269 min read
Read Article
Latest Articles

HVAC Systems
What Is a Recuperator AHU, and How Does It Compare With a Thermal Wheel?
A recuperator AHU recovers heat through a static plate pack; a thermal wheel does the same job with a rotating matrix and moves moisture with it. What separates them, the efficiency figures the manufacturers actually publish, and the different point schedule each type lands on a controls contractor.
11 Oct 20269 min
Read
BMS Technical
AHU Controls: How Air Handling Unit Control Sequences Actually Work
A full guide to AHU control sequences: start/stop and optimum start, the damper sequence, fan control, coil sequencing through a deadband, CO₂ demand ventilation, heat recovery by device type, both frost protections, and what to prove at commissioning before you accept a unit.
11 Oct 202612 min
Read
Case Studies
24V Window Actuator Wiring After a School Roof Replacement
Royal Harbour Academy, Ramsgate: eight weather-damaged 24V window actuator feeds re-cabled in 4 mm² fire-resistant cable, AHU control cabling drawn back and re-terminated, and extract fans wired back to the BMS during a roof replacement.
2 Oct 20267 min
Read
HVAC Systems
VAV Installation: TROX VAVs & Sontay CO₂ on a Trend BMS
A real VAV installation on a refurbished office floor: four TROX TA-Silenzio extract VAVs and Sontay duct CO₂ sensors wired back to a Trend panel two floors up. Core-by-core terminations, the signal-range and mode checks that decide whether the floor works, and what good looks like at handover.
28 Sept 20269 min
ReadMore Articles
Page 10 of 15

BMS Technical27 Apr 202613 min
Distech BMS Systems: ECLYPSE, EC-Net and Open Protocol Building Controls
Read Article
BMS Technical27 Apr 202616 min
Trend BMS Systems: The Complete Guide to Trend Building Management
Read Article
BMS Maintenance27 Apr 202611 min
Why Every FM Company in Kent Needs a Dedicated BMS Partner
Read Article
BMS Maintenance27 Apr 202614 min
BMS Support for Property and Building Management Companies in London and Kent
Read Article
BMS Technical22 Apr 202614 min
Commercial Leak Detection: BMS-Integrated Systems vs Standalone IoT Sensors
Read Article
BMS Technical22 Apr 20269 min
The Hidden Cost of Running Mixed BMS Brands
Read Article
BMS Technical22 Apr 20269 min
Can You Add AI Fault Detection to an Existing Trend IQ System?
Read Article
BMS Technical22 Apr 20269 min
Schneider EcoStruxure Metering Expert: BMS or Energy Monitor?
Read Article
BMS Technical22 Apr 202610 min
Schneider Electric vs Siemens Building Controls
Read Article
BMS Technical22 Apr 20268 min
Siemens synco Living in Commercial Buildings: When the Spec Gets It Wrong
Read ArticleReady to Optimise Your Building?
Get expert advice on building management systems, energy efficiency, and building automation solutions tailored to your needs.
Get in Touch