
Blog & Insights
Building Management Insights
Expert advice, industry insights, and practical guides on building management systems, energy efficiency, and building automation technology.
Filter & sort
Current sort: Date: Newest first. Read filter: any.
149 articles found

HVAC SystemsFeatured
Why the Frost Stat Is on the Extract Side of a Plate Heat Exchanger
On a plate heat exchanger AHU the frost protection reads the extract, not the incoming fresh air, and engineers rewire it believing it to be a mistake. Why the ice forms on the extract side, how pack frost protection differs from the coil frost stat, and what actually triggers a defrost.
11 Oct 20269 min read
Read Article
Latest Articles

HVAC Systems
What Is a Recuperator AHU, and How Does It Compare With a Thermal Wheel?
A recuperator AHU recovers heat through a static plate pack; a thermal wheel does the same job with a rotating matrix and moves moisture with it. What separates them, the efficiency figures the manufacturers actually publish, and the different point schedule each type lands on a controls contractor.
11 Oct 20269 min
Read
BMS Technical
AHU Controls: How Air Handling Unit Control Sequences Actually Work
A full guide to AHU control sequences: start/stop and optimum start, the damper sequence, fan control, coil sequencing through a deadband, CO₂ demand ventilation, heat recovery by device type, both frost protections, and what to prove at commissioning before you accept a unit.
11 Oct 202612 min
Read
Case Studies
24V Window Actuator Wiring After a School Roof Replacement
Royal Harbour Academy, Ramsgate: eight weather-damaged 24V window actuator feeds re-cabled in 4 mm² fire-resistant cable, AHU control cabling drawn back and re-terminated, and extract fans wired back to the BMS during a roof replacement.
2 Oct 20267 min
Read
HVAC Systems
VAV Installation: TROX VAVs & Sontay CO₂ on a Trend BMS
A real VAV installation on a refurbished office floor: four TROX TA-Silenzio extract VAVs and Sontay duct CO₂ sensors wired back to a Trend panel two floors up. Core-by-core terminations, the signal-range and mode checks that decide whether the floor works, and what good looks like at handover.
28 Sept 20269 min
ReadMore Articles
Page 4 of 15

BMS Installation16 Jul 202612 min
BMS Electrical Installation in London: What It Actually Involves
Read Article
Innovation12 Jul 20268 min
AI in Building Management Systems: What's Working, What's Risky, What's Hype
Read Article
Security12 Jul 20268 min
BMS Cyber Security: Why Your Building Management System Is the Soft Way In
Read Article
BMS Technical12 Jul 20269 min
BMS Vendor Lock-In: Who Actually Owns Your Building's Controls?
Read Article
BMS Upgrades12 Jul 20269 min
BMS Lifecycle Planning: How to Build a Five-Year Controls Upgrade Strategy
Read Article
HVAC Systems12 Jul 20269 min
Heat-Pump Performance Monitoring: What Your BMS Should Trend and Measure
Read Article
Energy Management10 Jul 202610 min
The UK Net Zero Carbon Buildings Standard: Why Your BMS Decides Whether You Can Prove It
Read Article
BMS Upgrades15 Jun 202614 min
BMS Upgrade in London: Migrating Legacy Controls in High-Value Commercial Buildings
Read Article
BMS Upgrades12 Jun 202615 min
BMS Upgrade in Kent: When Legacy Systems Cost More Than Replacement
Read Article
BMS Installation10 Jun 202613 min
BMS Installation in London: Costs, Timelines, and What Goes Wrong
Read ArticleReady to Optimise Your Building?
Get expert advice on building management systems, energy efficiency, and building automation solutions tailored to your needs.
Get in Touch